• ASTM D 1177 Coolants Testing Equipment Freezing Point Apparatus
  • ASTM D 1177 Coolants Testing Equipment Freezing Point Apparatus

ASTM D 1177 Coolants Testing Equipment Freezing Point Apparatus

Type: Universal Testing Machine
Maxcapacity: <1000KN
Accuracy Grade: 0.5
Load Way: Electronic Load
Loading Method: Static Load
Display: Digital
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2020

Suppliers with verified business licenses

Rating: 5.0/5
Chongqing, China
100% Finished Products Inspection
The supplier inspects 100% of finished products.
Standardized quality control
The supplier has a complete and standardized quality control process, check the Audit Report for more information
R&D Capabilities
The supplier has 3 R&D engineers, you can check the Audit Report for more information
Production Process Visualization
You can check the supplier's production workflow chart or main facilities in the Audit Report
to see all verified strength labels (27)

Basic Info.

Model NO.
DP-2430A
Control
Computer Control
Weight
0-100Kg
Power Source
AC220V
Oil Cylinder Position
Under
Display Method
English Display
Transport Package
Wooden Case
Trademark
TOPTESTER
Origin
Chongqing, China
HS Code
9027
Production Capacity
1000 Sets/Month

Product Description

This instrument is designed and manufactured according to the national petrochemical industry standard GB/T2430, ASTM D1177 . It is suitable for measuring the freezing point of engine coolant and its concentrated solution.



Technical Parameter

 
  1. Power supply: AC220V + 10%; 50Hz.
 
  1. Working cold groove: double layer vacuum glass bath.
 
  1. Cold tank temperature control: +20 ~ -70 ºC
 
  1. Temperature control accuracy: + 0.5.ºC
 
  1. Bath stirring: stirring motor automatic stirring, power 6W, 1200r/min.
 
  1. Refrigeration system: a new type of refrigeration compressor.
 
  1. Sample mixing: synchronous deceleration motor, 60 times / min.

  1. The ambient temperature: 30 ºC.
 
  1. Relative humidity:  85%.
 
  1. Power consumption of the whole unit:  2000W.




Instrument structure

The instrument is composed of two parts, the left is the refrigeration studio, the right is the control and workbench.


Left: Refrigeration studio, equipped with refrigeration compressors and refrigeration devices.
Right: there are mainly working cold groove, bracket part, stirring part, panel part.


Our Company
Chongqing TOP is a professional leading manufacturer and supplier of oil purifiers and various testers for petrochemical products and power equipment. 

Honest Team - TOP always honestly treat you and keep faith to make you satisfied with every cooperation with us.
Sincere Communication - TOP sincerely communicate with you to guarantee the provided products to be your ideal ones.
Reliable Quality -TOP own high quality and high performance for every TOP product is under strict quality control and testing.
Service Commitment - TOP bring you prompt, considerate and professional aftersale service and technical support, and explore technology future together.
ASTM D 1177 Coolants Testing Equipment Freezing Point Apparatus
ASTM D 1177 Coolants Testing Equipment Freezing Point Apparatus
ASTM D 1177 Coolants Testing Equipment Freezing Point Apparatus

FAQ
What is the mini order quantity?
MOQ: generally 1 unit/piece/set

What payment methods are supported?
Payment method: By T/T, L/C, Alibaba Trade Assurance etc.
Payment terms: Generally, T/T 40% advanced, the balance paid by T/T when the machine is ready; or 100% irrevocable L/C at sight. Small testing instrument is uaually by T/T 100% advanced.

What are the available delivery methods?
Our port location: Chongqing, Shanghai or other main port of China 
Delivering to: Worldwide 
Delivering method: by sea, by air, by truck, by express, combined transportation

How long is the product date of delivery probably?
Delivery date differs with product type, order quantity, special requirement etc. Usually our big machine delivery date is around 10 ~ 20 days; test equipment or analyzer delivery date is around 5~10 days. Some products have stock, contact us anytime to get more information.

How long is the warranty period?
We warrants the plant supplied under agreed specification against defects in material and workmanship under normal use and service for a period of 2 years after start up of the system. 

How is the technical services on the product?
Engineer available to service machinery overseas. If you have any technical question, you are welcome to contact us any time. We will response promptly and answer to your satisfaction. If required and necessary, we can send our engineer to your place to provide technical support.

(Key words for PT-2000: consolidation point, pour point test equipment, pour point testing device, pour point tester, pour point, pour point test equipment, oil pour point tester, oil cloud point, automatic pour point tester, cloud point tester, freezing point tester, pour and cloud point tester, cloud and pour point apparatus, freezing point for oil, pour point determinator, pour point measure, pour point and cloud point apparatus, astm d97 pour point tester, oil tester, cloud pour, pouring tester, pouring measure, ASTM D97 Pour Point Tester/Low Temperature Pour Point Meter/Pour Point Petroleum Products,pour point measuring device,pour point apparatus, transformer oil pour point determinator,Solidification Point tester,oil pour point machine,oil pour point measuring kit )

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now